1
Investment
volume
500
mln. р
Payback
period
2
of the year
Plant Construction
to Produce Expanded
Clay Gravel

There are 2 possible options to implement the project:
— Launching the plant on the ready-made production sites
— Plant construction from scratch

State support:
1. Soft lending from 0.1 % per annum
2. Full-service project support
3. Subsidy of equipment leasing up to 50%, but not more than 50 million rubles.
4. Provision of land plot without tender procedures

Economic feasibility:
– Availability of raw materials (undistributed deposits of expanded clay)
– Advantageous location with respect to transport links – motor roads and railways